• Skip to Page content
  • Skip to WISTA Sites
  • Skip to Main menu
WISTA
  • WISTA
  • WISTA.Plan
  • WISTA.Service
  • Adlershof
  • Charlottenburg
  • South West
  • Marzahn
  • WISTA direkt
  • Search
    • de
    • en
  • WISTA
  • WISTA Management
    • Mission / Management
      • Company Profile
      • Team
      • Boards
      • Annual Reports
      • Invitations to tender
      • Business Office Zukunftsorte
    • Sustainability / Diversity
    • Subsidiaries
    • Directions
  • News / Press
    • Overview
    • News
    • Events / Calendar
      • Diversity Conference Adlershof
    • Social Media Wall
    • Press
    • Magazine "Potenzial"
    • Adlershof Journal
    • Downloads
  • Services
    • All WISTA services
    • Business programmes
      • Adlershof Startup Lab
    • Networks / Cooperations
    • Talent promotion / Recruiting
    • Event and Visitors Service
  • Projects
    • Focus Topics
    • Team Innovation
  • Sites
    • Overview
    • Technology Park Adlershof
      • Business Directory
    • Innovation Centre CHIC Charlottenburg
    • Innovation Campus FUBIC South West
    • CleanTech Business Park Marzahn
    • House of Games
    • Zukunftsorte Berlin
  • Real Estate
    • Current Real Estate Offers
    • ST3AM Working Environments
    • Facility Management
  • Talents
    • Overview
    • WISTA as Employer
      • Jobs
    • WISTA Academy
    • Talent Promotion / Training
      • workhier! Young Academics Career Program
      • STEM project SLE
  • WISTA
  • WISTA.Plan
  • WISTA.Service
  • Adlershof
  • Charlottenburg
  • South West
  • Marzahn
WISTA direkt
  • Home WISTA Management
  • News / Press

News / Press

  • Overview
  • News
  • Events / Calendar
  • Social Media Wall
  • Press
  • Magazine "Potenzial"
  • Adlershof Journal
  • Downloads
  • Editorial Staff
  • Home WISTA Management
  • News / Press
28. January 2026

A record year for the HZB living lab for building-integrated solar facades

The solar modules on the facade of the Adlershof research building produced almost 32 MWh of electricity in 2025

Two people point upwards at the solar wall
© BAIP/HZB

In 2025, the solar facade of the BIPV living laboratory  (BIPV – Building integrated photovoltaics) in Berlin-Adlershof generated more electricity than in any of the previous four years of operation. With about 32 MWh, the modules produced enough electricity to power more than 12 average four-person households. Thanks to the energy-intensive research landscape at the Helmholtz-Zentrum Berlin, all of the electricity generated can also be consumed on site by the research facility at any time.

Even after five years of operation, the building-integrated solar modules show no measurable degradation. Differences in annual energy yield can so far be attributed exclusively to weather-related fluctuations.

According to the German Weather Service, the duration of sunshine in 2025 was around 1,900 hours nationwide. In addition, the year was comparatively low in precipitation, which, together with the high duration of sunshine, explains the high solar yield. December was particularly remarkable: exceptionally good PV weather led to yields more than twice as high as in the previous year. Especially in spring, autumn and winter, the sun is more favourable for the solar facade, so the researchers regularly observe higher yield peaks than in the summer months.

Further information:

BIPV living laboratory at HZB

Contact:

Helmholtz-Zentrum Berlin für Materialien und Energie
PVcomB - Competence Centre Photovoltaics Berlin
BAIP - Consulting office for building-integrated photovoltaics

Dr. Björn Rau
(030) 8062-18153
bjoern.rau(at)helmholtz-berlin.de

Niklas Albinius
niklas.albinius(at)helmholtz-berlin.de

 

Credit: HZB news, 27 January 2026

Research Renewable Energies Grand Challenges Climate

Related News

The Solar Consultant

Niklas Albinius shares his knowledge about building with photovoltaics
BIPV living laboratory at the HZB in Berlin © HZB

HZB's Photovoltaic living lab reaches the 100 Megawatt-hour mark

The solar facades of the building in Adlershof provide insights into building-integrated photovoltaics
[Translate to English:] Bernd Rech and Christian Rickerts start the Real Lab © HZB / M. Setzpfandt

HZB uses electricity-producing facade wall as real laboratory

Solar façade of the new research building in Adlershof was officially commissioned
Karin Haas, Björn Rau © WISTA Management GmbH

Because it’s better!

Adlershof-based institutes and companies demonstrate how sustainability works
HZB-Team BAIP © arö/HZB

Solar-cell façade at HZB undergoes real-life testing

360 solar modules integrated into the building envelope of the new BESSY testing hall

Related Institutions

  • Helmholtz-Zentrum Berlin für Materialien und Energie GmbH, Elektronenspeicherring BESSY II
  • Helmholtz-Zentrum Berlin, PVcomB Kompetenzzentrum Dünnschicht- und Nanotechnologie für Photovoltaik Berlin

Share this page

  • © WISTA Management GmbH
  • Legal Notice
  • Privacy Policy
  • Contact
  • Career
  • Press
  • Social Media Guide
Member of:
Zukunftsorte Berlin Logo